Alberta Railway Museum
 
The parts arrived for the furnaces in Calder Shop and the installation is complete.  The amount of heat generated  by this radiant heating system is amazing.  The work party on Saturday, December 10 will find that the work environment is greatly improved.

Thanks to Ken from Meridian Construction, the Trackmobile arrived by truck from Camrose in the early afternoon.  It was unloaded from the flat deck by crane, placed on track and was pushed into Calder Shop between Twinky and 1392, Twinky doing the honors. Thanks go to Terry, Brad, Don, Jim and Ken who made it happen.  Assisting were Barry and Hans. Work needs to be done on the engine but the unit is inside the heated bay in Calder.
This marks the end of a transaction that began in early May of this year and we are grateful to Everaz Pipe in Camrose.

Herb




 


Comments




Leave a Reply